Doe’s Report On The August Blackout

Secretary Abraham’s remarks on the release of the blackout report indicate some failure to meet reliability standards on the part of FirstEnergy, among other things:

The Electric System Working Group found that the initial events that led to the cascading blackout occurred in Ohio.

The Electric System Working Group has concluded that at least four reliability standards established by NERC were not observed by FirstEnergy on August 14th, and two were not followed by MISO. These failures helped create a problem of such magnitude as to be insurmountable.

The entire report is available at the DOE website.